Since 2005 many advanced (aerobic) wastewater treatment systems (also known as On-site effluent treatment or OSET) have gone through the trial facility established by Environment Bay of Plenty (in conjunction with Environment Waikato and Rotorua District Council) and now operated by Rotorua District Council, to determine which system could meet the approved standard.
The table below highlights the systems approved for installation in the Rotorua lakes' catchments. All systems shown may be installed elsewhere in the Bay of Plenty, however conventional septic tanks are still permitted in most areas outside Rotorua lake catchments. Unless there is a council sewerage scheme planned for your area, any new septic systems installed into the Rotorua catchment must be of an approved model or a resource consent needs to be obtained.
| Approved for installation in Rotorua Catchments | Irrigation Pump included in test? | Measured power use (kWh) per day? | Equivalent annual power cost | |
|---|---|---|---|---|
| Trial 1 (2005-2006)* See Trial 1 Note below | ||||
| Devan Blue DB900NRS (564KB, pdf) | - | Yes | 6.3 | $517 |
| Hynds Lifestyle (564KB, pdf) | - | Yes | 1.7 | $140 |
| Innoflow AdvanTex Ax20 (564KB, pdf) | - | No | 0.6 | $49 |
| Oasis Membrane MBR (564KB, pdf) | - | Yes | 7.3 | $600 |
| Smith and Loveless (Microfast 0.5) (564KB, pdf) | - | No | 7.2 | $591 |
| Biolytix BF6 2500 PAT (564KB, pdf) | - | Yes?1 | 0.2 | $16 |
| Supertreat SB440 (N12) | - | Yes | 10.8 | $887 |
| Waipapa Tanks Nitro-Treat P-N-12-2 (refer to Note A) | - | - | - | - |
| Trial 2 (2006-2007) | ||||
| Bio-Microbics MicroFAST 0.9 (1.9MB, pdf) | - | Yes | 8.9 | $731 |
| Devan Blue 9000NRS (1.3MB, pdf) | - | Yes | 2.7 | $222 |
| Hynds Lifestyle Ultimate (1.6MB, pdf) | Yes | Yes1 | 2.2 | $181 |
| Reflection Textile EW (3MB, pdf) | - | Yes1 | 2.5 | $205 |
| RX Plastics Airtech 9000 NR (1.7MB, pdf) | Yes | Yes | 5.3 | $435 |
| RX Plastics Airtech 9000 (1.7MB, pdf) | Yes | 4.9 | $402 | |
| Waipapa Tanks Econo Treat P-10-2 (3.1MB, pdf) | Yes | 1.3 | $107 | |
| Trial 3 (2007-2008) | ||||
| Biocycle 6300 (476KB, pdf) | - | Yes | 2.5 | $205 |
| Innoflow AdvanTex AX20 (405KB, pdf) | Yes (refer to Note B) | Yes | 1.1 | $90 |
| Oasis Clearwater S2000 (481KB, pdf) | Yes | Yes | 2.0 | $162 |
| Waipapa Tanks Maxi-Treat MV-C3000 (610KB, pdf) | Yes | Yes | 8.4 | $690 |
| Trial 4 (2007-2008) See Trial 4 note below | ||||
| WaterGurus NovaClear | - | Yes | 4.6 | $378 |
| Humes FR1 | Yes (Provisional) | Yes | 5.2 | $427 |
| Hynds Lifestyle | Pending | Yes | 1.8 | $148 |
| Waipapa Tanks Econo-Treat VBB C-2200-2 | Yes (Provisional) | Yes | 1.8 | $148 |
The Rotorua trial site where these systems have been tested has made the transition to a national wastewater system test facility. An independent group called 'SWANS-MAG' ('Small Wastewater and Natural Systems – Management and Auditing Group') will grade results from trial 3 and all future trials.
Trial 1 Note
In early 2009 Environment Bay of Plenty decided to no longer recognise the results of trial 1 for the purposes of approving waste water treatment systems for installation in our region. Trial 1 had a number of limitations in terms of flow variability which may have influenced systems’ performance. The current trial facility has undergone a complete rebuild since the early days and now has very robust systems in place to ensure a high degree of flow uniformity and consistency.
This system is almost identical to the trialled SuperTreat SB440(N12) however is marketed by Waipapa Tanks and includes a modified venturi (pat pend) for improved energy efficiency.
Note 'B'
This system may currently be installed as a permitted activity anywhere in the Bay of Plenty region, including the Rotorua lakes’ catchments provided all other requirements of the On-Site Effluent Treatment Regional Plan are met. It is currently being re-tested in trial 5 to confirm its performance.
Trial 4 Note
The results for this trial are provisional and subject to confirmation by SWANS-MAG early 2010. In the interim, the two systems indicated as approved in trial 4 may be installed in all areas including Rotorua catchments as a permitted activity provided all other requirements of the On-Site Effluent Treatment Regional Plan are met.
Visit our page about choosing a system.
Read the Rotorua Lakes Factsheet on the Onsite Treatment Regional Plan
If you want to install an advanced system, rule 13 of the On-site Effluent Treatment Regional Plan applies.
Unless connected to a sewer by December 2010 most conventional septic tanks systems in the catchments of Rotorua, Rotoiti, Rotoehu, Okaro and Okareka, will be required to upgrade to an approved advanced waste water treatment system. Those in Tarawera, Rotoma, and Hamurana have until December 2014.
Rotorua District Council plans to construct a sewerage system for the communities of Gisborne Point, Hamurana, Hinehopu, Rotoma, Okareka, and Tarawera. It is also examining the possibility of a sewerage scheme for a number of communities including Mamaku, Kennedy Bay, Tumoana Road, and Rerewhakaaitu.
Refer to rule 2 of the On-Site Effluent Treatment Regional Plan for more information.
| Quick Links | Major Projects | Contact Us |
|
Bay Bus Job Vacancies Pests Live Monitoring Resource Consents Wave Buoy |
Rotorua Lakes Ten Year Plan Regional Land Transport Strategy Tauranga Harbour Rotorua Air Quality |
T: 0800 ENV BOP (368 267) F: 0800 ENV FAX (368 329) info@envbop.govt.nz www.envbop.govt.nz |