Home
Land Water Coast Air
| land | water | coast | air
 Land Monitoring
 Heritage Areas Threats
 Protection
 Organisations
 Alphachloralose For Bird Control
 Feral Goats
 Magpie Control
 Possums
 Fumigation
 Poisoning
 Shooting
 Other Methods
 Rats
 Wasps
 Fact Sheets
 Dairy Effluent
 Detention Dams and Drop Structures
 Farm Dairy Fact Sheets
 Farm Tracks
 How to Plant
 Run off Pasture Management
 Tall-Species
 Medium Species
 Low Species
 Bridges
 Culverts
 Fords
 Tagasate Uses And Management
 Tasmania Blackwood Uses And Management
 Tree Willows
 Shrub Willows
 Weed Control
 Woodlot Species
 Stock Water Supply
 Revegetation Projects
 Disturbed Sites
 Plants for Coastal Conditions
 Sand Country Pastures
 Fact Sheets
 Rotorua
 Tauranga
 Whakatane
 Application
 Eligibility
 Requirements
 Taxis
 Vouchers
 Quarry Guidelines
 Earthwork Guidelines
 Regional Geothermal Plan
 Regional Land Management Plan
 Regional River Gravel Management Plan
 Regional Water and Land Plan
 Onsite Effluent Treatment Plan
 Outside Rotorua Lakes' Catchments
 Rotorua Lakes' Catchment
 Choosing a system



Choosing a system

Things to consider when choosing an advanced wastewater treatment system (not a septic tank system)

Fixed Costs
When getting a quote, check if it includes delivery, and installation.  Does it also include the irrigation system and pump?

Running Costs
Do these  include electricity, maintenance, servicing, etc?  Use the table on the Rotorua Lakes' catchment page to get an indication of electricity usage of the models we have tested.  

Servicing / Maintenance
How often is this required?  What is involved?  How much servicing is included in the purchase price? Who is available to repair the system if it breaks down?

Operation
Is it noisy?  Does it smell?  How does it handle peak loads? e.g. for the extended family at Christmas time. Some chemicals and cleaners can cause the useful ‘bugs’ to die off, which can result in the entire system malfunctioning.

Size
How much space does it require?

Warranty
What guarantees are offered?

References
Check at least one or two references of people who own them.

Compliance with Regional Plan
Will the manufacturer take responsibility for ensuring that the system meets the regional plan requirements, including providing the necessary certification to Environment Bay of Plenty? Refer to rule 12 or 13 of the On-Site Effluent Treatment Regional Plan.





Return To Top

A to Z Page Index A to Z Page Index
 Contact Us Contact Us
Print Version Print Version
Search
Your favourites Your favourites
      Wave Buoy
      Rotorua Lakes
      Job Vacancies
      BayBus
      Tauranga Harbour
      Papamoa Hills
      Live Monitoring
tukutuku