Environment Bay of Plenty Logo
Land Water Coast Air
| land | water | coast | air
 History
 Geothermal Resource Under Threat
 Biological and ecological value
 Social, cultural and traditional value
 Historic and heritage value
 Demographic value
 Scientific value
 Economic value
 Tourism and recreation value
 Utility value
 Local significance value
 Regional, national and international significance value
 Problems
 Geothermal Reports
 Minutes and Reports
 Lake Okareka
 Lake Okataina
 Lake Okaro
 Lake Rotoehu
 Lake Rotoma
 Lakes Rotorua / Rotoiti
 Lake Tarawera
 Lake Tikitapu
 Rotorua Lakes Strategy Joint Committee
 Rotorua Lakes Recreation Strategy
 FAQs
 Maps
 NPLAS
 Nutrient Assessment Officer
 Frequently Asked Questions
 Archive lake closures 2007/08
 Lake Fact Sheets
 Lake Health Warnings
 Lake Water Quality
 Lake Statistical Information
 Living Near Lakes
 Media Releases and Articles
 Diversion Consent
 Diversion Structure Questions
 Ohau Picture Gallery
 Phytoplankton and Cyanobacteria
 Reports to Council
 Sullivan Lake Project
 Technical Reports
 Trophic Level Index
 Electronic lake signs
 East Cape at Haparapara
 Edgecumbe
 Kaituna at Fords Cut
 Lake Rotorua at Wharf
 Ohiwa Harbour at Port Ohope
 Otara at Town Wharf
 Otara at Browns Bridge
 Rangitaiki at Kokomoka
 Pongakawa
 Rotorua at Kaharoa
 Rotorua at Pererika Street
 Tarawera at Awakaponga
 Tauranga at Otumoetai
 Tauranga Harbour at Omokoroa
 Utuhina at Old Taupo Road
 Waimana at Ranger Station
 Waioeka at Cableway
 Waipapa at Goodalls
 Whakatane Town Wharf
 Whakatane at Huitieke
 Wave Buoy
 Telemetry Disclaimer
 Tauranga Harbour
 Whakatane Harbour
 Navigational Bylaws
 Rotorua Lakes
 Lakes Strategy
 On-Site Effluent Treatment Plan
 Regional Plan for the Tarawera River Catchment
 Regional Water and Land Plan
 Rotorua Geothermal Regional Plan
 Transitional Plan
 Kaituna Catchment Control Scheme
 Macroinvertebrate Monitoring
 Rangitaiki Drainage Scheme
 Rangitaiki-Tarawera Rivers Scheme
 Waioeka-Otara Rivers Scheme
 Whakatane-Waimana Rivers Scheme
 Monitoring information



On-Site Effluent Treatment Plan

Maintenance and Inspection Programme - On-Site Effluent Treatment Regional Plan 2006

The On-site Effluent Treatment Regional Plan 2006 became operative on 7 August 2006. This plan supersedes all previous versions of the plan. The plan deals with on-site effluent treatment systems that discharge 2 cubic metres (m3) or less of effluent a day to land.

The plan focuses on areas where discharges from septic tanks are contributing to poor water quality including groundwater and the water margins of lakes, estuaries and shorelines within the region. Advanced on-site effluent treatment systems are required to be installed to improve water quality in specific areas identified by the plan.

To address water quality problems, the plan prescribes minimum standards for the design and installation of on-site effluent treatment systems. The on-site effluent treatment system needs to be designed and constructed to suit the constraints of the site. These constraints include depth to the water table, soil type, soil permeability, size of the land treatment area, slope and the expected volume of discharge.

The plan also requires a compulsory maintenance regime in identified communities serviced by septic tanks. Environment Bay of Plenty does not want to force upgrades for minor failures where reticulated sewage is likely in the foreseeable future. Therefore, Council has reviewed the situation for communities where sewage reticulation is anticipated in the near future and made adjustments as shown in the table below.

The maintenance programme also relates to properties with septic tanks that are within 200m of a lake edge within the Rotorua lakes catchments.  These properties have until 1 December 2006 to have their first cleaning and inspection carried out.  However implementation of the cleaning and inspection programme has been deferred for those properties identified in the Rotorua District Ten Year Plan (2006) as having funding set aside for reticulation in the first five years (by 2011).

Maintenance programme status for specified communities
Western Bay Communities Maintenance programme status

Maketu

Potential sewage reticulation within three years (2009) – programme currently suspended and to be reviewed December 2006.

Little Waihi

Potential sewage reticulation within three years (2009) – programme currently suspended and to be reviewed December 2006.

Omokoroa

Sewage reticulation about to take place – programme suspended.

Ongare Point

Ongare Point First inspection due by 1 December 2006.

Te Puna

First inspection due by 1 June 2006.

Tanners Point

Varies according to date of first inspection and whether an outlet solids filter is fitted or not.

Rotorua Lakes communities Maintenance programme status

Mourea 

Sewage connection now available.

Okawa Bay

Sewage connection now available.

Hinehopu

Varies according to date of first inspection and whether an outlet solids filter is fitted or not.

Gisborne Point

Varies according to date of first inspection and whether an outlet solids filter is fitted or not.

Okere Falls

Implementation deferred - Rotorua District Ten Year Plan has set aside funding for reticulation to occur within the next five years (by 2011).

Otaramarae 

Implementation deferred - Rotorua District Ten Year Plan has set aside funding for reticulation to occur within the next five years (by 2011). 

Rotokawa

Implementation deferred - Rotorua District Ten Year Plan has set aside funding for reticulation to occur within the next five years (by 2011).

Brunswick

Implementation deferred - Rotorua District Ten Year Plan has set aside funding for reticulation to occur with the next five years (by 2011).

Okareka

Sewage reticulation about to take place – programme suspended.

Hamurana

Implementation deferred - Funding set aside for reticulation in next five years in Rotorua District Ten Year Plan.

Rotoma

First inspection due by 1 December 2006.

Tarawera 

Varies according to date of first inspection and whether an outlet solids filter is fitted or not.

Environment Bay of Plenty have certified inspectors to inspect your system when pump out is required. The current certified inspectors are:

  • TransPacific Technical Services (Rotorua)
  • Rotorua Waste Disposal (Rotorua)
  • Tankman Trans-Pacific (Western Bay)
  • Pete’s Takeaways Ltd (Western Bay)

 Click here for company details. (DOC, 41kb)

Return to Top

Upgrades to existing systems

The discharge from existing permitted onsite effluent treatment systems located within the maintenance and inspection programme zones (tabled above) will become discretionary as of 1 December 2010. Note that existing systems within communities of Tarawera, Hamurana and Rotoma will become discretionary as of 1 December 2014. To avoid this, the systems will need to be upgraded to meet the discharge limits of the plan. The discharge limits the coastal communities are biochemical oxygen demand (BOD5) 30 grams per cubic metre (g/m3) and suspended solids (SS) 45 g/m3. The discharge limits for the Rotorua lakes catchments are BOD5 30 g/m3, SS 45 g/m3, and total nitrogen 15 g/m3.

For the Rotorua lakes catchments the discharge limits BOD5 30 g/m3, SS 45 g/m3, and total nitrogen 15 g/m3 also apply to systems within 200 metres of a lake edge, and properties 2 hectares or less within the lake catchments of Rotorua, Rotoiti, Rotoehu, Okareko, and Okaro.

Maps identifying the areas where systems need to be upgraded in order to be permitted can be found within the On-site Effluent Treatment Regional Plan 2006 in Schedule 5 and Schedule 6.

Outlet solids filter

All new conventional septic tanks must have an outlet solids filter fitted. Having a outlet solids filter fitted means that the frequency of inspection can be extended from three years out to every six years.

Contacts

For any technical inquiries relating to on-site effluent treatment systems,  please contact Paul Futter or Sam Weiss , phone toll-free 0800 368 267, or email paul.futter@envbop.govt.nz or email sam.weiss@envbop.govt.nz.  All queries relating to the plan should be directed to Janine Barber, phone toll-free 0800 ENV BOP (368 267), or email janine.barber@envbop.govt.nz





Return To Top

A to Z Page Index A to Z Page Index
 Contact Us Contact Us
Print Version Print Version
Search
Your favourites Your favourites
      Wave Buoy
      Rotorua Lakes
      Job Vacancies
      BayBus
      Tauranga Harbour
      Papamoa Hills
      Live Monitoring
tukutuku